OVERALL CRANES FOR TURBINE MAINTENANCETests and commissioning of the two 110/20t overhead cranes and the 25/5t bridge of the hydroelectric plant at the MAREGES dam (19) on behalf of our client SHEM, ENGIE group.
| |
BRIDGE COUPLINGOn this occasion, the operation in coupling mode of the two 110/20t bridges was tested with a test load of 200t.
| |
ZOOMGrip spreader
|
Overhead cranes for the maintenance of hydroelectric turbines
Mareges hydroelectric plant.