Overhead cranes and semi-gantry cranes for the SNCF
| EQUIPMENT AT THE CHAMBLY SNCF SITE (60)Following the Brétigny-sur-Orge disaster in 2013, the SNCF made the decision to modernize in order to be able to replace sections of rail and switches more quickly and easily. To do this, they have implemented the VIGIRAIL plan, which aims to renew 300 to 500 switches every year.
|
TECHNICAL COLLABORATIONInitially, ADC and SNCF collaborated technically in order to define the specifications best suited to their constraints. These various exchanges also allowed us to consolidate our position with SNCF and SYSTRA, a consulting and engineering group for urban/rail public transport systems.
|
|
A BEAUTIFUL PROJECTThe call for tenders was launched in June 2016, and we obtained the order in August.
|