Synergie charpente - levage

Framing - lifting synergy

A great synergy between our Lifting-handling and Metal framework departments.

Framing - lifting synergy

A great synergy between our Lifting-handling and Metal framework departments. Delivery of a building (lot, framework, roofing, cladding and locksmithing) of 5,300 m² for the production of catamarans: with an average height of 10 meters, with spans of 15 meters, and halls with a span of 30 meters .

ADC also installed 10 overhead cranes: 2 overhead cranes 2 × 3.2 t/25 m, 4 overhead cranes 2 × 5t/28 m and 4 suspended overhead girders 1t/17.50 m.

This project, which represents 320t of steel for the framework, was delivered in record time: 7 months from order taking to delivery.

The whole thing was received without reservation a few months later.

Synergie charpente - levage

Similar achievements