Synergy between Steelworks & Lifting equipment

A nice synergy between our Handling-Lifting and Steelworks departments.

Delivery of a 5300m² building (framing, roofing, cladding and ironworks lots) for the production of catamarans: an average height of 10 meters, with bays of 15 meters, and halls of 30 meters span.

ADC has also installed 10 overhead cranes: 2 x 3.2t / 25m overhead traveling cranes, 2 x 5t / 28m overhead cranes and 4 x 1t / 17.50m hanging cranes.

This project, which represents 320t of steel for the frame, was delivered in record time: 7 months from order to delivery.

The whole was commissionned without reserve a few months later.